Personal tools
You are here: Home IONs Operations / Control Room --obsolete-- B2 Level Locked Up and Target Hall/ B2 Areas Access
Navigation
Log in


Forgot your password?
April 2019 »
April
SuMoTuWeThFrSa
123456
78910111213
14151617181920
21222324252627
282930
 

--obsolete-- B2 Level Locked Up and Target Hall/ B2 Areas Access

— filed under: ,

By Aurelia Laxdal, as per Violeta Toma, March 26, 2007, edited by Rene Tanaja

 

Until further notice, B2 level needs to be locked up when ISAC Operators are not here overnight. This is because EF-13 may not automatically start if EF-12 ttrips off. This is a precaution, while there is no operator on duty.

 

Addendum, March 29, 2007

 

Until further notice, please remind everybody to check with us before accessing the Target Hall and B2 level areas, even if they have an active work permit.

Similar signs were posted on two doors:

  • At B2 level area (near elevator).
  • Outside door (East side) that connects with the TH and B2 level.

 

Document Actions