Approvals required for removing hatch blocks in ISAC
Added to the updated manual ("Work Permits") on March 21, 2013 -- JA
Keeping Track of Downtime
--obsolete-- Revision / New Installation Form
Accelerator Operations Group
Date: August 22, 2006 The TRIUMF Emergency Plan is attached. It is required reading for ISAC Operations personnel.
In Case of a Power Outage: After the Site Power is Restored
During the last power outages the ISAC generator did not correctly transfer back to normal power. ISAC-II was affected adversely, in particular, the UPS system ...
7500 call forwarding
Date: Jun 28, 2006
--obsolete-- ISAC Firewall
Obsoleted by J.Aoki 2017-11-02 based on new information provided by K.Ezawa: "Physical ISAC Firewall has been retired and ISAC Firewall rules are provided by ...
RMS/NMS defeats
Changes to the Trip Algorithm for BL2A Overcurrent
--obsolete-- Vacation Requests
E-Log Commentary
--obsolete-- Work Permits and the TRIUMF Operating Licence
--obsolete-- HR Time Sheets
Starting CRYO ALH in MCR
ISAC Operator must take following three steps to start Cryo Alarm Handler in Main Control Room.