Search results — 15 items matching your search terms
Subscribe to an always-updated feed of these search terms
- Approvals required for removing hatch blocks in ISAC
- Added to the updated manual ("Work Permits") on March 21, 2013 -- JA
- Keeping Track of Downtime
- --obsolete-- Revision / New Installation Form
- Accelerator Operations Group
- TRIUMF Emergency Plan
- Date: August 22, 2006 The TRIUMF Emergency Plan is attached. It is required reading for ISAC Operations personnel.
- In Case of a Power Outage: After the Site Power is Restored
- During the last power outages the ISAC generator did not correctly transfer back to normal power. ISAC-II was affected adversely, in particular, the UPS system ...
- 7500 call forwarding
- Date: Jun 28, 2006
- --obsolete-- ISAC Firewall
- Obsoleted by J.Aoki 2017-11-02 based on new information provided by K.Ezawa: "Physical ISAC Firewall has been retired and ISAC Firewall rules are provided by ...
- RMS/NMS defeats
- Changes to the Trip Algorithm for BL2A Overcurrent
- --obsolete-- Vacation Requests
- E-Log Commentary
- --obsolete-- Work Permits and the TRIUMF Operating Licence
- --obsolete-- HR Time Sheets
- Starting CRYO ALH in MCR
- ISAC Operator must take following three steps to start Cryo Alarm Handler in Main Control Room.