Search results — 28 items matching your search terms
Subscribe to an always-updated feed of these search terms
- Performing a "Large Mass Scan"
- -- Obsolete -- Polarizer Test, April 19 - 23, 2008
- Approvals required for removing hatch blocks in ISAC
- Added to the updated manual ("Work Permits") on March 21, 2013 -- JA
- -- Obsolete -- EF12 VFD Documentation
- For referred-to diagrams, see ION, March 8, 2007.
- -- obsolete -- MEBT Bunch Rotator startup instructions
- incorporated into manual March 2014 - TA Instructions for starting the MEBT Bunch Rotator. Email exchange between Jon Aoki and Zheng Ting Ang on March 30, ...
- Operations / Control Room
- Keeping Track of Downtime
- Beam Blocker Check During Vault Lock-up
- Date: November 10, 2006 By: J. Aoki From: Doug Preddy
- Resetting IMSIOC
- RFQ RF Auto On Procedure
- In Case of a Power Outage: After the Site Power is Restored
- During the last power outages the ISAC generator did not correctly transfer back to normal power. ISAC-II was affected adversely, in particular, the UPS system ...
- RFQ RF Auto-On Procedure
- Date: December 1, 2006 By: Violeta Toma
- Manuals and Training Materials
- Procedure for Target Conditioning
- --obsolete-- 8Pi Dewar Change and Fill Instructions
- Procedures for Christmas shutdown only, and only if 8Pi asks IOps nicely. The diagrams referred to are on the ION in the blue book, usually around the ...
- -- obsolete -- RFQ recovery procedure
- incorporated into manual March 2014 - TA Date: June 17, 2003
- Warn and Trip Levels for the Yield Station RMS
- Dosimetry Requirements
- An update / clarification of dosimetry requirements for visitors and contractors.
- --obsolete-- Superconducting Solenoid Power Supply Instructions
- ***IMPORTANT***: Please make this one of the first things to do during a power outage!!!
- Electrical Services (Electrical Breakers)
- Starting CRYO ALH in MCR
- ISAC Operator must take following three steps to start Cryo Alarm Handler in Main Control Room.
- Performing an IMS:YSLIT0 Scan
- --obsolete-- 8Pi Vent Valve for E1171 implantations (may4/2009)
- Finding Beam after the Mass Separator Magnet (IMS:MB2).
- Forms and Checklists
- FAS "Defeat" Procedures
- Date: December 20, 2006 From: Mark Stenning Work Permit requirements for maintenance or modifications to the fire alarm system.
- FAS "Defeat" Procedures
- Delivery of Beams with the FEBIAD Ion Source
- With the addition of the FEBIAD to the pool of available ion sources, ISAC Operations needs to be especially careful as to which species are transported ...