Personal tools
You are here: Home

Did you not find what you were looking for? Try the Advanced Search to refine your search.

Search results 28 items matching your search terms

Subscribe to an always-updated feed of these search terms

Performing a "Large Mass Scan"
-- Obsolete -- Polarizer Test, April 19 - 23, 2008
Approvals required for removing hatch blocks in ISAC
Added to the updated manual ("Work Permits") on March 21, 2013 -- JA
-- Obsolete -- EF12 VFD Documentation
For referred-to diagrams, see ION, March 8, 2007.
-- obsolete -- MEBT Bunch Rotator startup instructions
incorporated into manual March 2014 - TA Instructions for starting the MEBT Bunch Rotator. Email exchange between Jon Aoki and Zheng Ting Ang on March 30, ...
Operations / Control Room
Keeping Track of Downtime
Beam Blocker Check During Vault Lock-up
Date: November 10, 2006 By: J. Aoki From: Doug Preddy
Resetting IMSIOC
RFQ RF Auto On Procedure
In Case of a Power Outage: After the Site Power is Restored
During the last power outages the ISAC generator did not correctly transfer back to normal power. ISAC-II was affected adversely, in particular, the UPS system ...
RFQ RF Auto-On Procedure
Date: December 1, 2006 By: Violeta Toma
Manuals and Training Materials
Procedure for Target Conditioning
--obsolete-- 8Pi Dewar Change and Fill Instructions
Procedures for Christmas shutdown only, and only if 8Pi asks IOps nicely. The diagrams referred to are on the ION in the blue book, usually around the ...
-- obsolete -- RFQ recovery procedure
incorporated into manual March 2014 - TA Date: June 17, 2003
Warn and Trip Levels for the Yield Station RMS
Dosimetry Requirements
An update / clarification of dosimetry requirements for visitors and contractors.
--obsolete-- Superconducting Solenoid Power Supply Instructions
***IMPORTANT***: Please make this one of the first things to do during a power outage!!!
Electrical Services (Electrical Breakers)
Starting CRYO ALH in MCR
ISAC Operator must take following three steps to start Cryo Alarm Handler in Main Control Room.
Performing an IMS:YSLIT0 Scan
--obsolete-- 8Pi Vent Valve for E1171 implantations (may4/2009)
Finding Beam after the Mass Separator Magnet (IMS:MB2).
Forms and Checklists
FAS "Defeat" Procedures
Date: December 20, 2006 From: Mark Stenning Work Permit requirements for maintenance or modifications to the fire alarm system.
FAS "Defeat" Procedures
Delivery of Beams with the FEBIAD Ion Source
With the addition of the FEBIAD to the pool of available ion sources, ISAC Operations needs to be especially careful as to which species are transported ...