-OBSOLETE- TUDA ground switch
Nov. 6th, 2017: This procedure is replaced by Docushare document#108073
--obsolete-- ISAC II Accelerated Beam
--obsolete-- Safety Interlock Defeats
"The attached note summarizes a discussion Andy and I had regarding interlock defeats." - John Drozdoff
--obsolete-- Work Permit Requirement for ISAC Experiments
Date: October 10, 2001
RMS/NMS defeats
--obsolete-- IRMS Warn and Trip Setpoints
Date: June 1, 2006
ISAC Target Maintenance Hall Emergency Pushbuttons
Edit 2017-11-06: Confirmed with J.Drozdoff that the MAA push-button trips the cyclotron and the other push-buttons have been labelled "emergency ...
ISAC Safety System PLC and Display Changes
--obsolete-- DRAGON Perimeter Fence
IOC Reboots cautions
Date: Jul 26, 2006
--obsolete-- B2 Level Locked Up and Target Hall/ B2 Areas Access
SCRF Cleanroom Shielding Door Instructions
End date: Until interlocks are installed.
--obsolete-- Flammable Gas Warning @ DRAGON Ion Chamber
See the NEW Flammable Gas Warning @ DRAGON Ion Chamber. [Procedures on the web under Standard Procedures had been updated. Instructions in the blue binder at ...
-- obsolete -- DRAGON access lock-up procedure
Date: March 29, 2004
-- obsolete -- ISAC II Accelerator Vault Access
ISAC II Active Sump
Standard procedure is for the ISAC-II sump to be assayed before being drained. Since commissioning there has been no activity found during the assays, so for ...
-- Obsolete -- Target Hall Survey Requirements
Mass Separator Room Access with CSB commisioning
Access to the MSR with new CSB setup
Procedure for an EF1 Failure
Safety system operation
Date: August 2002
Survey requirements in the target hall
Date: May 28, 2002
Radiation Levels at MEBT
Dosimetry Requirements
An update / clarification of dosimetry requirements for visitors and contractors.
-- obsolete -- DRAGON safety interlocks
Date: May 13, 2004
Detector at ISAC West Target Station
Date: March 27, 2001
--obsolete-- New Procedures for Operation of HV Equipment
Report on Interlocks Meeting
FAS "Defeat" Procedures
Date: December 20, 2006 From: Mark Stenning Work Permit requirements for maintenance or modifications to the fire alarm system.
FAS "Defeat" Procedures