Search results — 29 items matching your search terms
Subscribe to an always-updated feed of these search terms
- -OBSOLETE- TUDA ground switch
- Nov. 6th, 2017: This procedure is replaced by Docushare document#108073
- --obsolete-- ISAC II Accelerated Beam
- --obsolete-- Safety Interlock Defeats
- "The attached note summarizes a discussion Andy and I had regarding interlock defeats." - John Drozdoff
- --obsolete-- Work Permit Requirement for ISAC Experiments
- Date: October 10, 2001
- RMS/NMS defeats
- --obsolete-- IRMS Warn and Trip Setpoints
- Date: June 1, 2006
- ISAC Target Maintenance Hall Emergency Pushbuttons
- Edit 2017-11-06: Confirmed with J.Drozdoff that the MAA push-button trips the cyclotron and the other push-buttons have been labelled "emergency ...
- ISAC Safety System PLC and Display Changes
- --obsolete-- DRAGON Perimeter Fence
- IOC Reboots cautions
- Date: Jul 26, 2006
- --obsolete-- B2 Level Locked Up and Target Hall/ B2 Areas Access
- SCRF Cleanroom Shielding Door Instructions
- End date: Until interlocks are installed.
- --obsolete-- Flammable Gas Warning @ DRAGON Ion Chamber
- See the NEW Flammable Gas Warning @ DRAGON Ion Chamber. [Procedures on the web under Standard Procedures had been updated. Instructions in the blue binder at ...
- -- obsolete -- DRAGON access lock-up procedure
- Date: March 29, 2004
- -- obsolete -- ISAC II Accelerator Vault Access
- ISAC II Active Sump
- Standard procedure is for the ISAC-II sump to be assayed before being drained. Since commissioning there has been no activity found during the assays, so for ...
- -- Obsolete -- Target Hall Survey Requirements
- Mass Separator Room Access with CSB commisioning
- Access to the MSR with new CSB setup
- Procedure for an EF1 Failure
- Safety system operation
- Date: August 2002
- Survey requirements in the target hall
- Date: May 28, 2002
- Radiation Levels at MEBT
- Dosimetry Requirements
- An update / clarification of dosimetry requirements for visitors and contractors.
- -- obsolete -- DRAGON safety interlocks
- Date: May 13, 2004
- Detector at ISAC West Target Station
- Date: March 27, 2001
- --obsolete-- New Procedures for Operation of HV Equipment
- Report on Interlocks Meeting
- FAS "Defeat" Procedures
- Date: December 20, 2006 From: Mark Stenning Work Permit requirements for maintenance or modifications to the fire alarm system.
- FAS "Defeat" Procedures