--obsolete-- Attenuate TUDA beam intensity
Date: May 29, 2008
We will maintain 264keV/u for TUDA through the weekend. You may be asked to check the alignment from time to time. If requested by TUDA, you must first reduce the intensity to 100 counts by closing both RFQ slits to 0, and reducing slits near emittance rig (box 22/24) to get a 1000 counts at HEBT3:SID4. TUDA will put in their 2 mm collimatorwith SID detector behind. You should get 85% at the counts. That is TUDA SID/HEBT3:SID4 = 0.85. If significantly less phone BOB or Marc.
Once confirmed, insert HEBT3:FC4 and open slits to operating level. THis is also a good time to do a snapshot. (Some downstairs cups including FC49, MEBT:FC9, HEBT:FC5, HEBT#:FC4 and TUDA counts).