Personal tools
You are here: Home IONs Experiments Polarizer --obsolete-- ILE2:FG16 Malfunctioning

--obsolete-- ILE2:FG16 Malfunctioning

— filed under: ,

Date: Aug 7, 2008

Standard procedure for bringing polarized 8Li to bNMR to be used, except the helium flow controller ILE2:FG16 is not controllable. It is stuck at 1.23 sccm, which is higher than optimum but we should be able to run. The helium pump ILE2:TP15E has been reduced to 1000liter/sec model, so vacuum pressures in that chamber will be higher than normal.  I can be paged at 604-645-0027 if there are problems.

Rene's comment:

Phil says the higher He density will somewhat increase scattering and reduce transmission slightly.

Document Actions