--obsolete-- ILE2 Vacuum
Date: Aug 30, 2001
Unless a work permit allowing venting of the ILE2 polarizer is active, vacuum must be maintained in that section of beam line. This is because it usualy contains alkali-metal.
In the event of a power bump or other disruption, please turn on ILE2:TP12 and TP16. DO NOT turn on ILE2:CP15E cold head unless it was on before the glitch. TP15D and TP15E do not require running unless we are running beam.