Personal tools
You are here: Home IONs Safety - Radiation / Industrial / I(B)RMS -- Obsolete -- Target Hall Survey Requirements

-- Obsolete -- Target Hall Survey Requirements

— filed under: ,

From ION by Joe Mildenberger

Date: Oct. 16, 2007

 

Message from Joe:

This is to clarify the criteria for when a Target Hall survey is required following a loss of zoning when the hotcell lid has been opened:

 

- A survey is required before the next human access into the Target Hall.

- A survey is not required before returning the ventilation rate to its normal operating level.

Document Actions